Rigenerazione Urbana + Milano

  • 2_2200x1459.jpg
  • 1.1_2200x1459.jpg
  • 3_2200x1459.jpg
  • 4_2200x1459.jpg
  • 5_2200x1459.jpg

The project area is included in the Urban Renewal Sector – ARU. The ARU are parts of cities undergoing transformation, consisting mainly of productive areas with adjoining tertiary parts linked to small production, interspersed with sporadic presence of residential buildings. The aggregation of these types generates an uneven and disaggregated building fabric, devoid of urban references, in which it is difficult to intervene with a “regulatory” project of reference for the surrounding spaces. In this specific case, the small border public park was considered as a reference element and “regulator”.

We intervene on a particularly frayed building fabric without particular architectural references, in an area of small size that does not allow to significantly affect the context. For this reason, we said, it was decided to enhance the existing public space through the “visual” expansion of the green space, creating a wide strip of private green as an expansion of the park itself, a minimal fence without solid masonry parts and an open ground floor with large full-height windows that expands and gives depth to the space itself.

At the planimetric level, as already mentioned, the building is located parallel to the major axis of the urban public garden, leaving the latter the role of catalyst of the whole intervention. In its vertical development the building reveals all its particularity. A volume made visually light by the sinuous lines of the balconies, which enhance the best perspective views on each floor and shape each house differently.

Each floor is designed according to its orientation and reserves maximum comfort for its inhabitants. The sinuous balconies, between transparencies and opaque parts offer important outdoor spaces. The pre-painted iron parapets interrupt the gentle curves of the concrete at various points to allow the user to appreciate the private green and the park. Each apartment in the scheme, therefore, has access to an outdoor terrace that generally borders the living room and which acts as a multiplier of space and comfort of the housing unit. These generous outdoor spaces, real outdoor living rooms, connect private areas in search of harmony between the urban world and the natural environment.Great attention has been paid to the continuous LED lighting of the facades, recessed in the false ceiling of the balconies, follows their own sinuous course, reinforcing the role of urban landmark, even at night, of the intervention.

PROJECT DATA

CLIENT:   Private
TYPOLOGY:   residential
STATUS:   In progress
PLACE:   Milano
SUP:   — Mq
VOL:   — Mc
APPART. NUMB.:   25
PARKING PLACES:   25

Progetti Correlati

  • Particolare-2200.jpg
  • fronte-2200.jpg
  • Retro-2200.jpg

Via Scarpa + Milano

Project in implementation of the Convention to be carried out in two phases: - With the first phase, a building renovation project was drawn up with a change of intended use on the ground floor and recovery of the attic without an increase the s.l.p. of the existing building (building block "A"); The existing building has a rectangular plan with a "pavilion" roof. The slopes are supported by wooden beams with Marseilles tiles resting directly on strips. The windows and shutters are made of wood but do not have chromatic homogeneity. The facades are in a mediocre state of superficial conservation. The internal one also has an unsightly iron canopy covered with sandwich panels. The project includes: > The demolition of the canopy on the courtyard side and the formation, in its place, of a portico supported by eleven reinforced concrete pillars combined two by two > The replacement of all windows and shutters. > The redistribution of interior spaces. > The Formation of a new attic volume. The attic lies on the pre-existence, also resuming the scanning of the full and empty floors of the floor below, both on the Via Scarpa side and on the courtyard side, so as not to alter the perspective harmony of the existing building. - With the second phase, we proceed with the expansion with a new building (building block "B"); The building object of intervention or Factory Body "B" built in adherence to the pre-existing building defined as Factory Body "A" is spread over three levels. The part facing the inner courtyard will be the fulcrum of family life, it is in fact more protected from the eyes of strangers and turns the large openings towards the green property; For this reason, the rooms that require more light such as the kitchen and the living room are located here. On the street side, where the services and bedrooms are housed, the openings are smaller and recall those of the pre-existing building in form and above all in the scanning between full and empty spaces. Here and on the side elevation there is a vertical greening system of the façade which from an architectural point of view helps to better integrate the new building within the garden. The choices made from the point of view of facade cladding have a twofold objective. In the first place, guarantee the efficiency and sustainability of the cladding elements. Secondly, differentiate the character of the two buildings (the new and the pre-existing). The design of a green façade introduces aesthetic and environmental advantages in the context in which it is inserted, but the most important advantages are those inherent in the ecological aspect. Green facades, in fact, act on the microclimate and influence the physical-technical behavior of a building. In addition, when the green wall is a few centimeters away from the building, as in our case, an air gap is formed that offers the advantages of a ventilated wall, increasing thermal resistance. In summer it regulates the rise of the surface temperature and in winter its lowering. PROJECT DATA CLIENT:   Private TYPOLOGY:   residential STATUS:   In progress PLACE:   Milano SUP:   --- Mq VOL:   --- Mc APPART. NUMB.:   4 PARKING PLACES:   -